First of all, concrete mixing plant need to do the usual maintenance work, timely clean-up and timely inspection.
The most satisfactory method of preventing concrete from freezing is to heat the ingredients and to protect the completed job form freezing until a large percentage of the water has evaporated and sufficient strength has developed.
The truck mounted concrete pump is the concrete conveying equipment which connects concrete pump and distributing device directly on the chassis of the automobile.
Concrete mixer is the most important part of the concrete batching plants.
In the initial stage of construction site, when we choose the ready mix concrete plant, we should consider the late mobile problem.
When the need to repair, the mixing station tank should be cleaned concrete, and then overhaul.